YC Fall 2026 (F26) company

OpEra

The AI decision engine for factories, warehouses and fleets

About OpEra

OpEra Technologies is the AI decision engine for factories, warehouses and fleets. Companies with physical operations make thousands of decisions every day, and we help their teams make the best one at every step from production to delivery: (1) Planning: how much to make, buy and stock. (2) Scheduling: what runs when, and who works on what. (3) Allocation: which warehouse or store gets each order. (4) Routing: boat, plane or truck, and which route each one takes. Founded out of MIT's Operations Research Center.

Public traction evidence

Each signal links to the public source used for attribution.

  1. LinkedIn

    César Dori joins OpEra as a Founding Forward Deployed Engineer. Master's in data science at MIT, mechanical engineer from Imperial College London, and in between, years of deploying AI across private equity at Fidelity, supply chain and healthcare, in consulting and in startups. He knows how to walk into a customer's operation, find the bottleneck, and ship an AI solution. Welcome, César.

    César Dori joins OpEra as a Founding Forward Deployed Engineer. Master's in data science at MIT, mechanical engineer from Imperial College London, and in between, years of deploying AI across private equity at Fidelity, supply chain and healthcare, in consulting and in...

  2. LinkedIn

    Every company in an orchestra. An orchestra has a conductor. Most companies don't. Contact us at founders@operatechnologies.com

    Every company in an orchestra. An orchestra has a conductor. Most companies don't. Contact us at founders@operatechnologies.com

  3. LinkedIn

    See the decision change · Season 1: Logistics · Episode 1: The 3PL load plan Which pallet goes on which truck? At 2 p.m. a client drops 60 extra pallets on the dock, and the loads are rebuilt in seconds. An illustration of what OpEra builds on your own data. Want this for your operation? founders@operatechnologies.com

    See the decision change · Season 1: Logistics · Episode 1: The 3PL load plan Which pallet goes on which truck? At 2 p.m. a client drops 60 extra pallets on the dock, and the loads are rebuilt in seconds. An illustration of what OpEra builds on your own data. Want this for your...

  4. LinkedIn

    Procter & Gamble took more than $200 million a year out of its costs by redrawing which plant makes what. In 1993 P&G made Olay, Cover Girl and Max Factor alongside Tide and Pampers, in plants across the United States and Canada. Each category had grown its own plants and shipping patterns over decades. The company set up a study to ask one question across the whole network: which products should be made where, and shipped from where, to serve every customer at the lowest total cost. A team from P&G and the University of Cincinnati built integer-programming and network models and linked them to a mapping system, so managers could see each option on a map and apply their own judgment before deciding. What changed: - the number of North American plants cut by almost 20 percent - over $200 million a year in pretax savings - a finalist for the 1996 Franz Edelman Award, operations research's top prize for real-world results It took a company of P&G's size a dedicated team and a study that began in 1993 and was still being implemented in 1997. That's the gap we work on at OpEra: the same kind of model for a network of 3 plants or 30, built in weeks on the data a manufacturer already has. If your plants still run on the footprint they inherited, we'd like to hear how you decide what moves where. founders@operatechnologies.com

    Procter & Gamble took more than $200 million a year out of its costs by redrawing which plant makes what. In 1993 P&G made Olay, Cover Girl and Max Factor alongside Tide and Pampers, in plants across the United States and Canada. Each category had grown its own plants and...

  5. LinkedIn

    Zara added an estimated $586M in revenue over two years, using stock it already had. Until 2006, it decided how many units of each item and size to send to its 1,500 stores like this: every week, store managers requested quantities, and a team at the warehouse reduced those requests to fit what was left in stock. Zara then worked with Felipe Caro (UCLA) and Jérémie Gallien (MIT Sloan) to replace that step with a demand forecast and an optimization model that splits the warehouse stock across stores, size by size. They tested it against a control group before rolling it out. Sales went up 3 to 4 percent, about $233M of extra revenue in 2007 and $353M in 2008. The stores and the clothes stayed the same. What changed was the decision about where each unit goes. A lot of retailers still make that call with store requests and spreadsheets. If that's your team, we'd like to hear how you do it today. founders@operatechnologies.com https://lnkd.in/grdP2UXb

    Zara added an estimated $586M in revenue over two years, using stock it already had. Until 2006, it decided how many units of each item and size to send to its 1,500 stores like this: every week, store managers requested quantities, and a team at the warehouse reduced those...

  6. LinkedIn

    Google cut the energy one of its data centres spent on cooling by up to 40 percent by letting a model choose the settings. A data centre's cooling plant is a set of pumps, chillers and cooling towers. Which ones to run, and at what setpoints, changes with the weather and the computing load. Operators used to set them by formula and experience. In 2016 DeepMind trained neural networks on years of sensor data from the site to predict energy use for each option and recommend the best one. Operators applied the recommendations by hand. Tested by switching the recommendations on and off: - up to 40 percent less energy for cooling - 15 percent lower PUE overhead, the lowest PUE the site had ever seen In 2018 Google let the system control the cooling directly, under the operators' supervision. Every five minutes it takes a snapshot from thousands of sensors, picks an action, checks it against safety constraints in the cloud, and the local system checks it again. Operators can take back control at any time. Savings went from about 12 percent at launch to around 30 percent on average within months. Google has never said what that is worth in dollars. Business Insider's estimate at the time: tens, or even hundreds, of millions of dollars if applied across all of its data centres. That's the gap we work on at OpEra: the same idea for a plant or a fleet, built in weeks on the data the operation already has. How does your team set the operating points it adjusts every day? founders@operatechnologies.com

    Google cut the energy one of its data centres spent on cooling by up to 40 percent by letting a model choose the settings. A data centre's cooling plant is a set of pumps, chillers and cooling towers. Which ones to run, and at what setpoints, changes with the weather and the...

  7. LinkedIn

    Coca-Cola Enterprises cut its delivery costs by $45 million a year by changing how its dispatchers build their routes. Its direct-store delivery fleet was about 10,000 trucks. Every day, more than 300 dispatchers decided which stops went on which truck, and in what order. In 2004 and 2005 CCE put an optimization model under that decision, developed with the routing company ORTEC and Tilburg University. The dispatchers did not go away: more than 300 of them still plan the routes every day, now with the model. CCE moved over gradually instead of switching overnight; the write-up singles that out as the notable part of the project. What changed: - about $45 million a year in lower delivery cost - fewer miles driven, so less fuel burned - major improvements in customer service, reported alongside the savings - the same approach was then rolled out to other Coca-Cola bottlers and to beer distributors, among them Heineken, Carlsberg and InBev It was a finalist for the 2007 Franz Edelman Award, the top prize in operations research for results in the real world. That's the gap we work on at OpEra: the same kind of routing model for a fleet of 20 trucks or 20,000, built in weeks on the data a distributor already has. If your dispatchers still build tomorrow's routes by hand, we'd like to hear how. founders@operatechnologies.com

    Coca-Cola Enterprises cut its delivery costs by $45 million a year by changing how its dispatchers build their routes. Its direct-store delivery fleet was about 10,000 trucks. Every day, more than 300 dispatchers decided which stops went on which truck, and in what order. In...

  8. LinkedIn

    Kellogg has planned production for its cereal plants with an optimization model it installed in 1990 and still ran every Sunday morning a decade later. Five plants, seven distribution centers, about 15 co-packers. In cereal alone: 600+ SKUs, roughly 90 production lines and 180 packaging lines. Every week the same question: which product runs on which line, in which plant, and where the cases ship. Before that, each plant planned for itself, with spreadsheets and MRP software. In 1987 Kellogg decided that no longer worked for a product line that size and built the Kellogg Planning System with two operations researchers from the Naval Postgraduate School: a linear program that plans 30 weeks ahead and reruns each Sunday. Planners turn its output into the detailed schedules, and managers still adjust what doesn't fit the plant floor. What changed: - an estimated $4.5 million less production, inventory and distribution cost in 1995, once true plant costs were in the model - a monthly version for plant budgets and capacity decisions, which guided a consolidation with projected savings of $35 to $40 million a year - still in use more than ten years after it was built, when the team wrote it up in 2001 It took Kellogg years and a dedicated team to get there. That's the gap we work on at OpEra: the same kind of production plan, built in weeks on your data. If your weekly production plan still lives in a spreadsheet or old softwares, we'd like to hear how you build it. founders@operatechnologies.com

    Kellogg has planned production for its cereal plants with an optimization model it installed in 1990 and still ran every Sunday morning a decade later. Five plants, seven distribution centers, about 15 co-packers. In cereal alone: 600+ SKUs, roughly 90 production lines and 180...